MRCSS

  • Increase font size
  • Default font size
  • Decrease font size

Bee Contruction

PDF

Windrider Bee Construction

Article by Emil Weiler

 

ImageImage
1) Splitting the spar in two is easy.2) Cut spar slot with razor blade.
  
ImageImage
3) Widen slot with piece of 4-40, push down with stick. Thin CA in place.4) Servos in place.
  
ImageImage
5) Radio gear and battery layout - this is on the bottom side of wing!!6) Servo cover spacers.
  
ImageImage
7) Trailing edge tape.8) Taped per Karl's "Bee Build".
  
ImageImage
9) Laminating film for top - 5 micron.10)
  
ImageImage
11) Tape elevons on 45 degree angle down - tape goes on top of wing.12) Pushrod exit.
  
ImageImage
13)
14)
  

Image

Image

15) Brush in 5200 for hinge.16) Tape elevons at zero degrees overnight.
  

Image

Image

17)
18)
  

Image

Image

Image

Image

21) Finished top side22) Finished bottom side

 

 

Last Updated on Sunday, 01 March 2009 14:05